[mailto:ben@talmans.com]
[./pages/29achome.html]
[./pages/29achome.html]
[Web Creator] [LMSOFT]
Talmans
Dilapidation Report Examples
Page Version 4.0 Page Design by Talmans Construction Services
Internal and External Details in relation to Alterations to a Residential Property
General visible existing conditions to the structure of a Council Car Park in relation to the addition of an additional parking level
General visible existing conditions to the public street, concentrating on concrete kerbing and footpaths
A Multi-Discipline Business
© 2011 Ben Talman & Talmans Construction Services, Sydney, Australia,
All these images are Intellectual Property and protected by Copyright.All rights reserved.
 
  
Telopea Street
Barry Street
Olive Street
Dilapidation Reports, prepared by Talmans, generally include notes on conditions  found, photographs showing these conditions where possible, and a sketch or diagram indicating the position of these items noted.

The items shown or indicated in these reports do not relate to the structural integrity of the subject building or structure, only the visible condition of it.

A Structural engineer should be engaged to verify the structural integrity of any property in question.